Saving Time & Resources When Sending Reports

One-click send reduces operating costs and improves customer service!

BreakTest can save you over 90% of the effort spent on sending test reports manually:

  • Saves ~1.5 months per year for 50 daily tests
  • Savings compound if more than 50 test samples per day

Manual dispatch method vs. BreakTest dispatch method

Case Study Scenario:

  • 50 tests from multiple projects signed and dispatched via fax or e-mail to several stakeholders
  • System in place does not have one-click report dispatch capability for multi project tests
  • Statistics collected via actual timing of steps using e-mail client such as MS Outlook
BreakTest dispatch vs. Manual dispatch

Sending reports manually versus sending via BreakTest: Eliminate 8 tasks and save 50✛ minutes!

Time Consumption Comparison

BreakTest saves you time in various aspects of testing lab operations. The following table outlines how BreakTest can save you an hour per day on just one aspect of lab reporting, in this case, the process of signing and sending 50 test reports.

Spreadsheet & Manual Method

BreakTest Method

Task Time (sec) Task Time (sec)
Activities per Report 1. Browse to locate test file 5

1. Double-click test report, and sign it from the Dashboard

5
2. Double-click to open 2
3. Print each report 5
4. Manually sign document 5
5. Photocopy signed document 5
6. Store document in cabinet 10

7. Save as PDF to file server

5

8. Browse to signed file

5

9. Rename file descriptively

8

10. Prepare e-mail & recipients

8

11. Attach report file to e-mail

2
~60 sec / file 5 sec / file
Fixed Combine Activities 12. Sorting files by project 60

13. Walk over files to in/out trays

90

2. Click ‘Select All’, and then ‘Send Test(s)’

3

14. Walk over for photocopying

60

3. E-mail body, attachments, and recipients are generated

5 — 15
15. Walk over to filing cabinet 60

4. Click ‘Send’ on the confirmation window.

2

16. Coordinate tasks over phone

120
~390 sec 20 sec
For 50 reports (50 files ✕ 60 seconds)
✛ 390 seconds
~55 min (50 files ✕ 5 seconds)
✛ 20 seconds
5 min
Risk in Activities
  • Human oversight
  • Workflow interruptions
Omissions lead to repeat tasks
  • Alerts staff to review or dispatch
  • Less paper and foot traffic
Omissions are caught early
Conclusion 18 hours per month saved with BreakTest for just one set of reporting tasks:
i.e. (55 – 5) minutes ✕ 5 days ✕ (52 weeks / 12 months)

Leave a Reply